Case study

China → UAE

RoRo delivery of two new Hyundai and Volvo excavators from Shanghai to Jebel Ali

We shipped two new Hyundai and Volvo excavators from Shanghai to Jebel Ali by RoRo in 23 days. They arrived in good condition; our responsibility ended at the destination port.

New Hyundai excavator on the RoRo vessel deck

Project brief

Key shipment parameters

Route
Shanghai → Jebel Ali, UAE
Format
RoRo shipping
Actual delivery time
23 days port to port
Transport
RoRo vessel

Operational proof

How we handled the client brief

Client
Equipment importer
Objective
Deliver two new tracked excavators, Hyundai and Volvo, from Shanghai to Jebel Ali port.
Key considerations
The tracked equipment needed to enter and leave the vessel under its own power and be secured with specialized straps for the RoRo voyage.
Outcome
Both excavators arrived at Jebel Ali port in good condition after 23 days. West Matterhorn's responsibility ended at the destination port.

Route in detail

How the project was handled

  1. Acceptance in Shanghai

    We accepted two new tracked excavators, Hyundai and Volvo, at the sender's facility in Shanghai and prepared them for port dispatch.

  2. Loading preparation

    We prepared both excavators for self-propelled loading and securing for the sea voyage.

  3. Loading and securing

    The equipment entered the vessel under its own power and was secured with specialized straps.

  4. Shanghai → Jebel Ali

    We arranged the ocean RoRo shipment. The actual transit time from the port of departure to the destination port was 23 days.

  5. Jebel Ali port, UAE

    We handed the equipment over at the destination port in good condition. West Matterhorn's responsibility ended there.