Case study
South Korea → UAE
Mercedes-Benz GLC, BMW M240 and Bentley Continental GT: Incheon to Jebel Ali
Mercedes-Benz GLC, BMW M240 and Bentley Continental GT travelled together in one 40-foot High Cube container from Incheon to Jebel Ali via Khor Fakkan. After the Maersk sea leg, the container continued by road from Khor Fakkan to Jebel Ali. The route took 37 days from vessel departure in Incheon. Our scope included the customs declaration submission, terminal unloading and handover of the vehicles to the clients.

Project brief
Key shipment parameters
- Route
- Incheon → Khor Fakkan → Jebel Ali
- Format
- Intermodal container shipping
- Timing
- 37 days from vessel departure in Incheon
- Transport
- One 40-foot High Cube container for three vehicles; Maersk sea freight and road transfer
Operational proof
How we handled the client brief
- Objective
- Move three vehicles from South Korea to the UAE in one container and coordinate the sea, road and terminal stages through handover.
- Key considerations
- The route combined a Maersk sea leg with a road transfer of the same container after arrival in Khor Fakkan. The three vehicles had to be loaded and secured together in one 40-foot High Cube container.
- Outcome
- The container continued from Khor Fakkan to Jebel Ali by road after the sea arrival. At the terminal, the vehicles were unloaded and handed over to the clients. Our customs scope included filing the customs declaration. The 37-day figure is measured from vessel departure in Incheon, not from collection or terminal handover.
Route in detail
How the project was handled
Loading in Incheon
Mercedes-Benz GLC, BMW M240 and Bentley Continental GT were loaded and secured in one 40-foot High Cube container.
Incheon → Khor Fakkan
The container departed Incheon on a Maersk sea service. The reported route time of 37 days starts from vessel departure in Incheon.
Khor Fakkan → Jebel Ali
After sea arrival in Khor Fakkan, the container was placed on a truck and moved by road to Jebel Ali.
Terminal, declaration and handover
At the Jebel Ali terminal, the vehicles were unloaded. We filed the customs declaration and the vehicles were handed over to the clients after the terminal operations.
Visual record
Project photos






Case study
